Burgos
Universidad
Instituto Tecnológico y de Estudios Superiores de Monterrey
Monterrey, MéxicoPublicaciones en colaboración con investigadores/as de Instituto Tecnológico y de Estudios Superiores de Monterrey (19)
2024
-
Multi-ancestry genome-wide association meta-analysis of Parkinson’s disease
Nature Genetics, Vol. 56, Núm. 1, pp. 27-36
-
Novel risk loci for COVID-19 hospitalization among admixed American populations
eLife, Vol. 13
2023
-
A second update on mapping the human genetic architecture of COVID-19
Nature
-
Author Correction: Elucidating causative gene variants in hereditary Parkinson’s disease in the Global Parkinson’s Genetics Program (GP2) (npj Parkinson's Disease, (2023), 9, 1, (100), 10.1038/s41531-023-00526-9)
npj Parkinson's Disease
-
Defining the causes of sporadic Parkinson’s disease in the global Parkinson’s genetics program (GP2)
npj Parkinson's Disease, Vol. 9, Núm. 1
-
GWAS and meta-analysis identifies 49 genetic variants underlying critical COVID-19
Nature, Vol. 617, Núm. 7962, pp. 764-768
2022
-
Changes in classroom assessment practices during emergency remote teaching due to COVID-19
Assessment in Education: Principles, Policy and Practice, Vol. 29, Núm. 3, pp. 361-382
-
Novel genes and sex differences in COVID-19 severity
Human molecular genetics, Vol. 31, Núm. 22, pp. 3789-3806
-
Teachers’ Well-Being, Emotions, and Motivation During Emergency Remote Teaching Due to COVID-19
Frontiers in Psychology, Vol. 13
2019
-
Blade stress monitoring in a small wind turbine by using Arduino microcontroller
2018 IEEE International Autumn Meeting on Power, Electronics and Computing, ROPEC 2018
-
Tensile properties and failure behavior of chopped and continuous carbon fiber composites produced by additive manufacturing
Additive Manufacturing, Vol. 26, pp. 227-241
2014
-
Metaheuristic procedure for a bi-objective supply chain design problem with uncertainty
Transportation Research Part B: Methodological, Vol. 60, pp. 66-84
2013
-
A multi-start tabu search method for a single-machine scheduling problem with periodic maintenance and sequence-dependent set-up times
Journal of Scheduling, Vol. 16, Núm. 6, pp. 661-673
-
Bi-objective feature selection for discriminant analysis in two-class classification
Knowledge-Based Systems, Vol. 44, pp. 57-64
2012
-
Optimizing vehicle routes in a bakery company allowing flexibility in delivery dates
Journal of the Operational Research Society, Vol. 63, Núm. 5, pp. 569-581
2011
-
A heuristic approach for a scheduling problem with periodic maintenance and sequence-dependent setup times
Computers and Mathematics with Applications, Vol. 61, Núm. 4, pp. 797-808
-
A single machine scheduling problem with availability constraints and sequence-dependent setup costs
Applied Mathematical Modelling, Vol. 35, Núm. 4, pp. 2041-2050
2010
-
A computational tool for optimizing the urban public transport: A real application
Journal of Computer and Systems Sciences International, Vol. 49, Núm. 2, pp. 244-252
2009
-
A tabu search approach to an urban transport problem in northern Spain
Computers and Operations Research, Vol. 36, Núm. 3, pp. 967-979